Clinical engineering and medical technology consulting
Advice on medical equipment acquisition and on the design of the areas where it will operate.
Request consulting- From design
- Input on new builds and renovations.
- Acquisition
- Equipment selection with local support and spare parts.
- Commissioning
- Installation and staff training.
Healthcare technology management
A device’s performance depends on its installation conditions. We verify requirements before it arrives: drainage suitable for corrosive fluids in dialysis equipment, no ferromagnetic equipment in MRI areas and electrical installations with the required level of safety.
We join the project teams of new builds and renovations, so that areas are designed around the equipment they will house, including access for maintenance. We also advise on equipment selection and acquisition, focusing on local technical support and spare parts availability.
- Medical equipment acquisition advice
- Verification of installation requirements
- Electrical installation safety assessment
- Input on the design of operating rooms, intensive care units and services
- Installation, commissioning and training
Process
Project assessment
Acquisition, new service or renovation.
Site evaluation
Electrical installation, drainage, space and manufacturer requirements.
Recommendations
Equipment selection and area adaptation.
Commissioning
Installation, verification and training of medical and nursing staff.
Frequently asked questions
Do you take part in projects for new institutions?
Yes. We join the project team from the design stage.
Do you advise on equipment selection?
Yes: we assess alternatives, installation requirements and the availability of local technical support and spare parts.
Other services
Repair and technical service
Multi-brand, component-level repair of medical equipment, and authorized service for specific Medtronic, BD and Cincinnati Sub-Zero product lines.
Electrical safety testing
Testing to IEC 60601 and IEC 62353, with a certificate for each device. A standard requirement for equipment entering healthcare institutions.
Preventive maintenance
Annual plans to manufacturer specifications, with current records and certificates.
Request a quote
Provide the brand, model and requirement. Free diagnosis and a quote with a technical report within five business days.