Skip to content
Bioingeniería Clínica

Preventive maintenance for medical equipment

Annual plans to manufacturer specifications, with current records and certificates.

Request a maintenance plan
6 or 12 months
Interval defined by the manufacturer.
Annual order
Contracting model.
Current
Records and certificates for audits.
Included
Electrical safety test at every check.

Operational continuity and compliance

Unlike corrective maintenance, preventive maintenance verifies that a device operates within the manufacturer’s parameters and tolerances before a failure occurs. It is the basis of continuous, safe operation.

Checks are periodic, at the interval each manufacturer defines (typically every six or twelve months), and are documented with records and certificates for the institution’s audits. The service is contracted through an annual purchase order that includes an initial equipment survey and scheduling of every check.

  • Checks to manufacturer parameters and tolerances
  • Electrical safety test at every intervention
  • Records and certificates for the institution’s audits
  • Every six or twelve months, depending on the device
  • Annual contracts, with emergency service as agreed

Process

  1. Survey

    Equipment inventory and the maintenance frequency required by each manufacturer.

  2. Annual plan

    An annual purchase order for the period’s checks.

  3. Execution

    Scheduled checks, including the electrical safety test.

  4. Documentation

    Current records and certificates, ready for audits.

Frequently asked questions

How often is preventive maintenance performed?

Each manufacturer defines it; usually every six or twelve months.

How is it contracted?

Through an annual purchase order for the period’s maintenance. Terms are reviewed at each renewal.

Do you handle emergencies?

Yes, when included in the contract. Otherwise, during business hours and subject to technician availability.

Other services

Request a quote

Provide the brand, model and requirement. Free diagnosis and a quote with a technical report within five business days.

Request a maintenance plan